Ten named projects · £10M+ delivered

A portfolio you can take into a tender report.

Named clients, confirmed values, technical detail. Every project below was designed, fabricated and installed by 21 Degrees Heating.

Tower Bridge project Heritage

Tower Bridge

£800,000

Two new commercial boiler rooms and full distribution pipework inside a working heritage landmark - delivered through the height of the tourist season.

Case study
Kingston Hill Campus project Education

Kingston Hill Campus

£1,500,000

New plant rooms and full heating, hot water and ventilation distribution to 463 student accommodation rooms, with a 500m gas main installed by directional drilling.

Case study
Seething Wells project Education

Seething Wells

£1,000,000

Student accommodation heating and a site-wide gas network upgrade, with an Air Source Heat Pump installed to a Victorian heritage building.

Case study
Bow Street Magistrates project Heritage

Bow Street Magistrates

£750,000

New plantroom and full wet-services distribution for the conversion of the former Bow Street Magistrates Court into a hotel, alongside multiple trades in a heritage building.

Case study
St Martins Hospital project NHS & Healthcare

St Martins Hospital

£400,000

Complete renewal of three boiler rooms across three separate hospital blocks, including new BMS panels - strip-out to commissioning.

Case study
Brimmington Estate project Social Housing

Brimmington Estate

£1,200,000

New district heating mains from a centralised boiler house to over 1,000 properties - 2km of Class 1 welded pre-insulated steel pipework, civils included.

Case study
Middlesex & York Way Estates project Social Housing

Middlesex & York Way Estates

£1,500,000

New plant rooms and full heating and cold-water distribution across estate blocks, prepared for in-flat HIU and radiator handover.

Case study
Aylesbury Estate project Social Housing

Aylesbury Estate

£1,100,000

Complete refurbishment of a central energy centre - three 1.5MW boilers, 4.5MW of heat - feeding nine satellite plant rooms across the estate.

Case study
Dartford Civic Centre project Local Authority

Dartford Civic Centre

ASHP scheme

A large Air Source Heat Pump scheme upgrading the Civic Centre plant room to a system powered solely by Air Source - gas-free.

Case study
Orchard Theatres project Heritage

Orchard Theatres

Gas-free retrofit

Complete plant room regeneration to run gas-free - an Air Source Heat Pump conversion for a working cultural venue.

Case study

Need evidence for a submission? Get our capability statement.