Heritage £800,000

Tower Bridge

Two new commercial boiler rooms and full distribution pipework inside a working heritage landmark - delivered through the height of the tourist season.

Project value

£800,000

New boiler rooms

2

Setting

Live heritage landmark

Sector

Heritage

Project overview

This project involved installing new structural steelwork to extend the existing plantrooms within the two main piers. We removed the redundant plant and installed a completely new boiler plant onto the new steelwork platform.

From there we installed new distribution pipework up to the two public viewing walkways to feed the existing radiators and new high-level space heating. The existing gas supply to the south-west tower boiler room was leaking and had to be replaced - running a new pipe from the existing gas meter room located on Shad Thames beneath the bridge, through the gift shop and up onto the Tower Bridge Approach footpath within a duct.

All of this was carried out during the height of the tourist season. This was a complex project as we had to work around the public, staff and the busy traffic that crosses the bridge every day. Planning and preparation were key to the success of this project, which was completed on time.

Client

Tower Bridge / City of London

Location

Tower Bridge, London SE1

On site

Tower Bridge - installation detail 2
Tower Bridge - installation detail 3
Tower Bridge - installation detail 4
Tower Bridge - installation detail 5
Tower Bridge - installation detail 6
Tower Bridge - installation detail 7

Project photography from site. Higher-resolution imagery available on request.

Delivering something similar? Let’s talk.

Call Emergency hire